News and Articles

oil flow in a wind tunnel
The needs of aircraft designers and aerodynamicists have begun to grow at a pace that requires changes in equipment and techniques used by those that produce aerodynamic data for the design of aircraft. New techniques of flow visualization have been developed, and as technology . . .
Milcom
Booth 817 Calspan is excited to be attending MILCOM 2017 as an exhibitor. MILCOM is a conference for global military communications professionals, giving industry leaders the opportunity to hear and understand the requirements, pace of change and state of play in a variety of . . .
VISTA F16 Calspan
Niagara Falls, New York – July 11, 2017 – Calspan is pleased to announce the award of a 5-year contract worth more than $20 million by the United States Air Force. Calspan will provide services that include support for the Variable Stability In-Flight simulator and Test Aircraft . . .
IMG 9468
Calspan Aerospace has successfully demonstrated the feasibility of carrying and operating a U.S. Navy Aerial Refueling Store (ARS) on our company-owned Gulfstream G-III Airborne Testbed. Share This:
Calspan Flight Testbed
June 28, 2016 | Buffalo, New York – Calspan Aerospace has successfully completed a flight test program to demonstrate the feasibility of carrying and operating a U.S. Navy Aerial Refueling Store (ARS) on their company-owned Gulfstream G-III Airborne Testbed. The ARS is typically carried . . .
GIII Testbed
June 2016 | Buffalo, New York – Calspan has been awarded a $7.3 million contract with the U.S. Army Corps of Engineers to facilitate operations and maintenance of a government-owned Gulfstream G-III aircraft. Press Release – Army GIII Contract (June 2016) FINAL Share This:
TACIT E1462977211383
TESTING FLY-BY-WIRE INNOVATIONS FOR FUTURE BIZJETS The Tacit Clear Test Management Project (TMP) is a Test Pilot School student-led test of a brand new fly-by-wire flight control system. The student team is comprised of two pilots and three flight test engineers, from the USAF . . .
VISTA
Calspan Corp. was awarded a two-year, $6.2M contract for continued maintenance and operation of the Air Force’s Vista F-16 aircraft. Calspan has been involved with the VISTA/NF-16D since its inception in the 1980’s. The VISTA/NF-16D aircraft provides a flight research testbed with in-flight simulation . . .

Contact Us

If you would like to learn more about our services, inquire here.